HAI Project Manager Explains: Weekly Video Review and Approval Pipeline
Every weekly Humanitarians AI Fellows video has to clear five pipeline steps and six PM approval gates, from Brutalist formatting rules to mandatory GitHub repos, before it gets scheduled.
Getting a video approved and scheduled inside the Humanitarians AI Fellows program isn't a matter of just uploading a file. There's a defined five-step pipeline and six specific approval gates every submission has to clear, and knowing the rules in advance saves a lot of back-and-forth with reviewers.
The weekly requirement
Fellows are expected to produce two videos per week, delivered in both aspect ratios, which works out to four files total per week. STEM content and project updates both count toward this, but project updates are treated as the absolute floor of the content window, not a substitute for substantive material.
The five-step pipeline
The review process runs from upload to final sign-off. Files go into a shared Google Drive folder, get named according to a strict template, and move through review until they receive the final call from Prof. Brown and Prof. Nina. Along the way, the fellow submitting the work pings their PM, Sanjana or Pooja, to flag that the upload is ready for review.
Hard formatting rules
Several requirements are non-negotiable. Every video needs to follow the Brutalist visual guidelines, render natively in 4K rather than being upscaled after the fact, and be produced in both 16:9 and 9:16 aspect ratios from the source, not cropped afterward. There's also a required, non-negotiable intro line that has to appear as written; it isn't a stylistic suggestion.
The six PM gates
Before a video moves to the publishing queue, it has to clear six checks in order: correct Brutalist formatting, native 4K at the source, confirmed 4K after upload, both aspect ratios delivered, clean formatting with properly rendered images, and text that stays legible on both desktop and mobile. Beyond formatting, reviewers also confirm the required intro line is present exactly as specified, and that the viewer walks away with one concrete takeaway, something they can now do or know that they couldn't before watching. Only after all six checks pass does a video move into the scheduling queue.
File naming and GitHub requirements
Naming is enforced at upload. Every file, across both aspect ratios of both weekly videos, uses the same base project name followed by an underscore and the volunteer's name, with no spaces, no dates, and no "v2" or "final" tacked on. Version history belongs in GitHub, not in the file name. GitHub itself is mandatory: the code or source project behind the video has to be uploaded, and the repository URL shared alongside the video files at submission time. No repository means no upload.
Shorts scheduling strategy
The vertical, 9:16 side of the channel has its own rule: shorts are scheduled at least one hour apart from each other, channel-wide, and each short links to the most popular existing related video. That link is chosen at scheduling time based on current performance, not pulled from memory or an old list.
Key takeaways
- Fellows submit two videos weekly in both aspect ratios, for four files total, with project updates as the content floor.
- Six PM gates cover formatting, native 4K, both aspect ratios, legibility, the required intro line, and a real viewer takeaway.
- File naming follows a strict project-name-plus-volunteer-name template, with no dates or version tags; version history lives in GitHub.
- A GitHub repository with the project's source code is mandatory at submission; there's no upload without it.
- Shorts are spaced at least one hour apart and linked to the current most popular related video at scheduling time.
Who this is for
This is a practical checklist for Humanitarians AI Fellows preparing a weekly video submission, whether it's a STEM deep dive or a project update. Anyone without an assigned PM yet should route their readiness message straight to Sanjana.
Chapters
- 0:00The Weekly Requirement: Navigating the "two videos, four files" rule in both aspect ratios
- 0:30STEM vs. Project Updates: Keeping project updates as the absolute floor of your content window
- 0:55The 5-Step Pipeline: From Google Drive upload to the final call from Prof. Brown and Prof. Nina
- 1:20Hard Formatting Rules: Brutalist guidelines, native 4K requirements, and the non-negotiable intro line
- 1:50The Six PM Gates: How reviewers evaluate format, legibility, and real viewer takeaways
- 2:20File Naming & GitHub: Enforcing the exact name template and linking mandatory code repositories
- 2:50Shorts Scheduling Strategy: Spacing vertical posts and leveraging related video links
- 3:15Your Turn: The ultimate checklist to review before submitting to Sanjana or Pooja
Full transcript(auto-generated, with timestamps)
The Weekly Requirement: Navigating the "two videos, four files" rule in both aspect ratios
[0:00]This is Liam in for San
STEM vs. Project Updates: Keeping project updates as the absolute floor of your content window
[1:39]Is about the summary of the topic." That
The 5-Step Pipeline: From Google Drive upload to the final call from Prof. Brown and Prof. Nina
[1:41]Intro is not a suggestion. The PM
Hard Formatting Rules: Brutalist guidelines, native 4K requirements, and the non-negotiable intro line
[1:43]Approval gate is six checks in order. Brutalist format followed correctly, 4K at source, 4K after upload, both 16 by 9
The Six PM Gates: How reviewers evaluate format, legibility, and real viewer takeaways
[1:51]And 9 by 16 delivered, formatting clean images rendered, text legible on desktop and mobile, the intro line is present in the required form, and the viewer walks away with a real takeaway, one thing they can now do or know that they could not before. All six clear, then it moves to the queue. Naming is enforced at upload. Every file, both aspect ratios of both weekly videos, gets the same base project name {underscore} volunteer name. No spaces, no dates, no V2, no final. Version history lives in GitHub, not in file names. The files go into the
File Naming & GitHub: Enforcing the exact name template and linking mandatory code repositories
[2:21]Shared drive folder, then the fellow pings Sanjana or Pooja that the upload is ready. Two closing rules. First, GitHub is mandatory. The code or source project used to make the film is uploaded, and the repository URL is shared with the video files at submission time. No repo, no upload. Second, the short side of the channel. 9 by 16 posts are scheduled at least 1 hour after the previous short, channel-wide, and each short links to the most popular existing
Shorts Scheduling Strategy: Spacing vertical posts and leveraging related video links
[2:51]That link is picked at scheduling time, not from memory. Your turn. Before your next submission, check your brutalist version. Render it 4K. Produce both aspects natively, and open with the intro line as written. Rename the files. Push the code to GitHub. Drop the URL alongside the videos, and tell Sanjana or Pooja the folder is ready. If you do not have a PM yet, that message comes straight to Sanjana. That is the whole pipeline. How the Humanitarians AI video
Your Turn: The ultimate checklist to review before submitting to Sanjana or Pooja
[3:15]Review process works. Liam, in for Sanjana.
More videos
2:08Bridging the Pixel Gap in Browser Automation.
2:23How One Narrow Safety Rule Can Make an AI Less Safe Everywhere Else.
2:04Why splitting a chunk from its document makes it retrieve for the wrong question
4:20Three You Can Take Back. One You Can't.
2:21Why a 50-turn agent pays for the same screenshot 35 times unless it caches the pixels
1:53